Delta Energy Systems SOLIVIA Gateway M1 G2 Manual de Instalação Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 30
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
EN
11Operation and installation manual SOLIVIA Gateway M1 G2
7.6 Power Connection
Connect the power source to the SOLIVIA gateway (Step 3 in gure 4) and check the
SOLIVIA gateway LED. If the setup is correct, the Status LED will be solid green for
approx. 5 seconds. For further information, please refer to Chapter 8.
Verify that your setup is successful by going to the SOLIVIA Monitor web portal at:
http://monitoring.solar-inverter.com and log in to view your PV system.
Internet
RS485
RESET RS485
EXT. CONTROL
1 2 3 4 5 6 7 8 A B
LAN INPUT
5V
GW
STATUS
2
3
1
Figure 4: Connection diagram
WARNING
Risk of death or heavy injury due to dangerous voltage
Repairs on defective cables should be done by qualied electri-
cians only!
Only recommended and / or commercially available cables
should be used.
7.7 Installation Feedback
NOTICE
This function works only for SOLIVIA solar inverters of the 4th generation!
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 29 30

Comentários a estes Manuais

Sem comentários